Q: What is the Continuing Authorities Program? A: The Continuing Authorities Program provides the U.S. Army Corps of Engineers Galveston District with the authority to solve water resource, flood risk mitigation. Introduction: Congress has provided the U.S. Army Corps of Engineers with a number of standing authorities to study and build water resource projects for various purposes and with specified limits on how much federal money can. Army Corps of Engineers Continuing Authorities Program (CAP) is a useful tool to support smaller community projects without the lengthy study and authorization process typical of most larger Corps of Engineers. Army Corps of Engineers Civil Works Policy Pocket Reference Prepared by the Policy and Policy Compliance Division and Planning Community of Practice. CAP– Continuing Authorities Program CFR. Omaha District > Missions > Civil Works > Planning > Project Authorities > Continuing Authorities. To initiate a CAP study, local government officials contact the Omaha District to request an investigation of a water resource problem. After receiving a request, the District will coordinate with the local officials (typically including conducting an initial site visit) to determine the extent and nature of the problem and which CAP authority would best meet their need. If the problem fits within one of the existing CAP authorities (and subject to availability of funds) the District will initiate a feasibility study to investigate the problem and possible solutions. The first $1. 00,0. Army Corps of Engineers assists a community's Brownfields and other livability efforts through its Civil Works and. Corps with any costs in excess of the initial $1. Within the first $1. Corps will evaluate whether a solution to the problem is both viable and in the interest of the federal government. If adequate federal interest exists, the Corps will work with the non- federal sponsor to develop a Project Management Plan outlining the scope of work, cost estimate and schedule for the detailed feasibility study and negotiate a Feasibility Cost Share Agreement (FCSA) to cover any anticipated costs above the initial $1. Non- federal sponsors are responsible for 5. Once negotiations are completed, the FCSA is executed and the feasibility phase begins. The feasibility study involves more intensive data collection and detailed technical investigations. The feasibility phase is usually completed in 1- 3 years depending on the scope and nature of the project. One exception is feasibility for the Emergency Streambank and Shoreline Protection (Section 1. Program which is usually completed in less than a year. The completed feasibility report is submitted to Northwestern Division office for review and approval which then allows the project to proceed directly to the design and implementation phase.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2016
Categories |